Yield assessment
Bankable energy yield to FGW TR6 with P50/P90.
Service details →Services on WINDIQ
Choose the service you need. Its detail page shows what it covers, which documents are needed and which independent firms offer it.
Understand the wind potential. Assess economic viability on a sound basis.
Bankable energy yield to FGW TR6 with P50/P90.
Service details →On-site wind measurements and LiDAR verification up to 200 m.
Service details →Revenue and market value assessment of the wind farm.
Service details →Match turbines and site. Identify risks early.
Checks whether wind and turbulence conditions suit the turbine type.
Service details →50-year extreme wind as the basis for structural stability.
Service details →Turbine-specific verification of structural stability based on the technical assessments.
Service details →Risks from ice throw and ice fall around the turbines.
Service details →Risks from rotor blade failure, tower failure and falling components.
Service details →Forecast the effects on the surrounding area transparently.
Noise immission forecast under TA Lärm.
Service details →Shadow flicker forecast at the receptors.
Service details →Sound emission measurement to FGW TR1 and acceptance measurements under § 29b BImSchG.
Service details →Find suitable sites, plan layouts and assess projects before you decide.
From search area to a robust map of potential sites, in Germany and internationally.
Service details →Constraint check and wind farm layout, presented on maps.
Service details →Assess projects and sites reliably before you decide.
Service details →Land-use and zoning plans for wind energy areas.
Service details →Support and management of the permitting procedure under the BImSchG.
Service details →Identify environmental concerns early and factor them into the permit.
Bird and bat surveys as the basis for the saP.
Service details →Special species protection assessment, with FFH where required.
Service details →Impact and compensation balance.
Service details →Assessment of the visual effect on the landscape.
Service details →EIA screening and full environmental impact assessment.
Service details →Habitats Directive screening and appropriate assessment.
Service details →Visual dominance under § 249 BauGB.
Service details →Realistic photomontages and analysis of the encirclement effect.
Service details →Assess operating data and prepare the next steps.
Site quality after commissioning to FGW TR10.
Service details →Turbulence assessment for operation beyond the design lifetime.
Service details →GEO-NET, anemos, I17-Wind and IEL are DAkkS-accredited testing laboratories to DIN EN ISO/IEC 17025. GEO-NET is also a MEASNET member, and IEL a notified measuring body under § 29b BImSchG. Accreditation applies to each company's own testing scope.